 |
|
|
Bridge Engineering
|
MAH-76-0.86 BRIDGE REHABILITATION (Mahoning County, Ohio)
This $15m bridge rehabilitation project entailed deck replacement and widening of the 2000’ long twin structures over Lake Milton. Two alternate designs, concrete and steel, were prepared. READ MORE
|
Bridge Inspection
|
JENNINGS-RANDOLPH ANNUAL BRIDGE INSPECTION (Hancock County, West Virginia)
The scope of this project includes annual bridge inspections, structural analyses and preparation of reports
with load rating and repair recommendations between 1999 and 2010. READ MORE
|
Construction Inspection
|
DAYTON EXPRESSWAY & PAUL LAURENCE DUNBAR BRIDGE REPLACEMENTS (Dayton, Ohio)
Barr & Prevost was recently selected by the City of Dayton to perform construction inspection services for the Dayton Expressway Bridge over Keowee Street and CSX Railroad and the Paul Laurence Dunbar Bridge over Wolf Creek. READ MORE
|
Drilling
|
AUG-116-0864 BRIDGE REPLACEMENT
Barr & Prevost is presently in the design stages of a replacement structure for the existing bridge, in Auglaize County. Our drilling personnel were dispatched to the site to advance geotechnical borings.
READ MORE
|
Environmental Engineering
|
Barr & Prevost is one of a consortium of 25 engineering firms that has been selected by the bi-state management team consisting of the Kentucky Transportation Cabinet and the Indiana Department of Transportation to design a section of a major transportation project identified as The Kennedy Interchange Reconstruction Project. READ MORE
|
Geotechnical Engineering
|
KENNEDY INTERCHANGE RECONSTRUCTION PHASE I
(Louisville, Kentucky)
Barr & Prevost is one of 25 engineering firms in a consortium identified as Kentucky Transportation Associates (KTA) that has been selected by the Bi-State Management Team consisting of the KYTC, INDOT and FHWA to design Section 1 of The Louisville – Southern Indiana Ohio River Bridges Project (LSIORBP) known as Kennedy Interchange Reconstruction. READ MORE
|
Highway Engineering
|
FRA-315-2.40 INTERSTATE REHABILITATION
(Franklin County, Ohio)
This 2.78 mile-long, $11.5M interstate rehabilitation project includes resurfacing and bridge rehabilitation on a major Columbus-area freeway. Four interchanges and ten bridges fall within the project corridor. READ MORE
|
Materials Testing
|
FRA-315-2.40 INTERSTATE REHABILITATION
(Franklin County, Ohio)
Mark Road Bridge is undergoing major rehabilitation to the entire structure (85-90%). Some of the items that are being engineered include: Minor re-alignment of the beams; New abutments and pilings; Rehabilitation to the existing truss structures; READ MORE
|
Surveying
|
MILLETT HALL ENTRANCE CONCOURSE RENOVATIONS (Miami University, Miami, Ohio
Millett Hall is the primary arena for indoor sporting events and concerts at Miami University’s Oxford campus and is located on the north side of the campus. The area primarily involved with this project consists of two parallel concrete walks that extend from Sycamore Street to the south entrance of Millett Hall. READ MORE
|
Traffic Engineering
|
This Major PDP Project will be used in Steps 1-3. This study analyzed the existing conditions of the I-71 and Fields
Ertel/Mason-Montgomery Road Interchange and made recommendations for interchange and corridor connectivity
improvements.
READ MORE
|
|
|
|