Hoover Road Bridge Rehabilitation
-
Construction Testing
Location: Owner: Client: Project Completion Date: Project Description: Included in the testing of the concrete for this project, we used Maturity Monitoring; a method to ensure accurate and real-time results of concrete strength. This method was used in the placement of the deck concrete. Utilizing the Maturity Monitoring method, Barr & Prevost was able to supply the contractor accurate; on-site concrete strengths. The information provided to the contractor they were able to remove forms and continue work at a much earlier time. This process would have normally had to wait until the Laboratory was able to provide “up to” 28-day strengths. This project was completed February of 2007. |